Location
PakistanRegion: South Asia
Country: Pakistan
Value: USD 30K
Start Date: 2017-12-15
End Date: 2019-06-24
Team Members
Ejaz AhmadAPEX Consulting Pakistan and China State Construction Engineering Corporation Ltd. entered into a Material Supply agreement for the Construction of Peshawar-Karachi Motorway Section II: Sukkur-Multan Section. Both parties reached an agreement regarding the collection and supply of the materials from the quarry situated in Sargodha.
APEX has been providing Black Crush for Asphalt Concrete of five different sizes i.e. 0-4.75mm, 4.75-9.5mm, 9.5-19mm, 19-25mm, 25-38mm, for the project of construction of Peshawar-Karachi Motorway Section-II: Sukkur to Multan Section from a quarry situated in Sargodha.